565/2025-2026

Lawngtlai, 30th March 2026 : A meeting was convened today at the Office Chamber of the Deputy Commissioner, Lawngtlai, to address the recent collapse of the bridge at Parva - I. The meeting was chaired by Pu Donny Lalruatsanga, Deputy Commissioner Lawngtlai and attended by the Sub-Divisional Officer (Civil), Chawngte, and representatives from BRTF, CADC, CCL International Limited, and the Joint Village Councils of Parva.

It was highlighted that the immediate priorities are to ascertain the cause of the collapse, ensure a thorough technical assessment, fix accountability, and restore connectivity at the earliest in the interest of public safety and mobility.

It was deliberated that a joint structural assessment of the collapsed bridge will be carried out by BRTF, with technical support from PWD, to determine the exact cause of failure, including aspects such as design, foundation, load conditions, and material integrity. Upon completion of the structural assessment, the District Administration will review the findings and forward a formal communication to the Chief Engineer, Pushpak, Aizawl, who will further escalate the matter with recommendations to ADGBR (East), Guwahati for necessary action and approval of restoration measures.

CCL International Limited has been directed to submit a formal written commitment indicating its willingness to provide financial support for restoration or reconstruction of the bridge, along with details of the scope and modality of such support. The company is also required to furnish verifiable documentary evidence confirming that the vehicle involved was operating within permissible load limits.

The Deputy Commissioner directed all concerned stakeholders to strictly adhere to the timelines and responsibilities assigned. It was reiterated that any delay or non-compliance will be viewed seriously, given the critical need to restore connectivity and ensure public safety.

The District Administration remains committed to taking all necessary steps in a coordinated and time-bound manner to address the situation effectively.

Attachment

  • Loading attachment...