258/2024-2025

AIZAWL; the 3rd October,2024: Mizoram Governor Shri Indra Sena Reddy Nallu visited the under-construction Sairang Railway Station and the Mualkhang-Sairang Bridge (Bridge No. 196), today,  at 11:30 AM. 

He was warmly received by Er. Harjimal Meena, Deputy Chief Engineer of NF Railway, and his team, who briefed him on the project's progress and plans. The officials shared that the railway station and bridge are expected to be completed by July 2025.

The Sairang Railway Station will have 13 tracks, comprising three passenger tracks and ten non-passenger tracks. After the visit, the Governor departed for Delhi from Lengpui Airport at 2:00 PM and is expected to return on October 7, 2024.

Attachment

  • Loading attachment...