1453/2025-2026 

Kawnpui to Sairang NH-06 Kawng siam mek a nih dan Report (2nd August, 2025 @8:30 AM)

1. Kawnpui to Sairang Peng (PWD Portion) :

a) Hnathawhte :

- Pot Holes Repair - 3 Locations

- Side Drain Clearance - 1 Location

- Landslip Clearance - 1 Locations

b) Machinery Deployed :

- JCB - 4 Nos

- Rock Breaker - 1 No

- Roller - 3 Nos

- Tipper - 4 Nos


2. Sairang Peng to Khamrang :

NHIDCL Works :

a) Pot Holes Repair - 4 Locations

b) Side Drain Clearance - 2 Locations

c) Machinery Deployed :

- JCB - 6 Nos

- Hitachi - 4 Nos

- Roller - 2 Nos

- Dumper - 5 Nos.

PWD Works :

a) Side Shoulder Clearance

b) Machinery Deployed : JCB - 3 Nos


3. Buichali to Sairang :

NHIDCL Works :

a) Pot Holes Repair - 2 Locations

b) Shoulder Clearance

c) Side Drain Clearance

d) Machinery Deployed :

- Hitachi - 1 No

- JCB - 1 No

- Grader - 1 No

- Tipper - 1 No


PWD Works :

a) Pot Holes Repair - 3 Locations

b) Side Drain Clerance - 1 Locations

c) Machinery Deployed :

- JCB - 2 Nos

- Roller - 2 Nos

- Tipper - 1Nos.