7/2023-2024
Dated Serchhip, the 3rd April, 2023: Mizoram sawrkar chuan “The Mizoram Water Supplies (Control) Acts, 2004 section 18” in thuneihna a pek angin Tui sem man a hnuaia mi ang hian a bithliah thar a (Notification No. G. 25022/1/2017-PHE, dt 15 March, 2023). Hei hi Mizoram pumah leh Serchhip District-ah pawh April, 2023 atanga hman tur a ni tih Pu Isaac Lalchhuanmawia, Executive Engineer, PHED, Serchhip WATSAN Division chuan hriattirna a chhuah-
· Tui sem zat/Month Tui sem man
5000 Lts. chin Rs. 220/-
5000 - 10000 Lts. Rs. 220 + 60/Kl.
10000 - 20000 Lts. Rs. 520 + 115/Kl.
20000 - 30000 Lts. Rs. 1670+135/Kl.
30000 Lts. chunglam Rs. 3020 + 160/Kl.
· Meter a chhiat emaw, a rintlak loh laiin thla 1-a tui bill chawi tur zat :
- Sorkar leh Connection pangngaiah - Rs. 500/- per month emaw, thla 3 bill
average emaw, a tam zawk zawk.
- Sumdawng (Commercial) ah - Rs. 1000/- per month emaw, thla 3
bill average emaw, a tam zawk zawk.
· Sumdawng (Commercial) connection-ah :
- 10000 Lts. per month chin - Rs. 900/-
- 10000 Lts. per month chung lam - Rs. 900 + 160/Kl.